Whirlpool WP C10X WBS EE tumble dryer Freestanding Front-load 10 kg White

Prekės kodas: 389474

Turimas kiekis: Prekės pristatymas 4-7 d.d.

€61067 su PVM
Turite klausimų apie šią prekę? Klauskite
Gamintojas: Whirlpool

Drum volume: 127 L
Inverter technology: Yes
Built-in display: Yes
Door colour: Black
Door hinge: Right
Loading type: Front-load
Cord length: 1.5 m
Drying system: Heat pump
Product colour: White
Control type: Rotary
Appliance placement: Freestanding
Custom panel-ready: No
Energy efficiency class: C
Energy consumption: 1.78 kWh
Heat source: Electric
Connected load: 800 W
Annual energy consumption: 211 kWh
Energy efficiency scale: A to G
AC input voltage: 230-240 V
AC input frequency: 50 Hz
Energy consumption per 100 cycles: 113 kWh
Weight: 48 kg
Depth with door open: 104 cm
Height: 846 mm
Width: 598 mm
Depth: 674 mm
Condensation efficiency class: B
Noise level: 63 dB
Anti-Crease function: Yes
Rated capacity: 10 kg
Adjustable drying level: Yes
Cycle time: 220 min
Drying programs: Wool, Steam, Sport, Refresh, Eco, Cotton, Delicate/silk
Noise emission class: B
Delay start (min): 1 h
Delayed start timer: Yes
Filter cleaning indicator: Yes
Drum interior light: Yes
Delay start (max): 24 h
Water tank full indicator: Yes
Warnings: Do not touch hot surfaces of the appliance., Do not leave the unit unattended during operation., Connect the appliance to a correctly earthed electrical socket.
Whirlpool technologies (clothes care): 6TH SENSE
European Product Registry for Energy Labelling (EPREL) code: 2259056
Parašyti atsiliepimą
Rašyti
Skambinti